Posts

House progress!

Image
Doors and Landscaping next!

Wall closing day

is scheduled for FRIDAY! Electrical walkthrough was this Saturday and the new subpanel is in. The low voltage stuff and cable runs are happening today and tomorrow. It won't be the fanciest house on the block, but I'm going to have a real network!

Habitat for Humanity ReStore=WIN

1139 Summit Drive, bel Air is undergoing a little demolition and has donated tens of thousands of dollars of custom cabinetry and stuff to HFH. 23 pieces of the custom kitchen- $4,400, a marble countertop $40, a gorgeous vessel sink on an antique table conversion $200. If only I was ready for these things now!

School enrollment and construction

Mission accomplished- class orientation is June 3. Construction is moving apace. Foundation and framing are mostly done. Our new windows arrived and are currently stacked in the dining room. I'm having fun picking tile and fixtures now

Annoying the neighbors

We owe the neighbors liquor, lots and lots of it. The construction fence went up and demolition commenced at 7am Monday. IT WILL CONTINUE 6 DAYS A WEEK. To meet the timeline, we need to do work six days a week, maximum hours. So sorry neighbors about the jackhammers on Saturday morning. We will try to get this part over with as quickly as possible.

Hello chain link!

The construction fence is supposed to go up today!
Image
The soon to be demolished architectural amenities. See that fascia board? Leaf debris built up behind it and caused the gutters to back up and seep under the eaves. The wood wicked the moisture to the plaster. Oh and that stop sign of a window way up high leaks air like you wouldn't believe. It may actually be sealed with playdoh.